少妇高潮一区二区三区四区-日韩卡一卡二卡三在线-久久亚洲中文字幕不卡一区二区-中文字幕午夜人妻久久一区-在线播放无码后入内射少妇-丰满肥臀大屁股熟妇激情热舞-日韩欧美国产综合在线播放-啊 啊 啊 快 高潮了男的拉尿-成人影院在线免费观看视频

Home > News > Detail

Detail

CEC be awarded the engineering survey and design contracts for first stage of new air port line and first stage of line 19 of Beijing Metro

2015-08-19   【 Big  Middle  Small 】   【 Printing 】   【 Close

On July 25, CEC is awarded the lot III contract (civil design) and the lot XII contract (track and acoustic barrier) for the project of Beijing Metro first stage of new air port line and first stage of line 19, with the contract value of 63.489 million RMB.

Thesuccessful bid is fully demonstrate the CEC’s exquisite specialized technical and large enterprise’s capabilities in the field of urban rail transit. It also reflects the enterprise culture of the spirit of positive upward, unity and cooperation, and increasesthe highlighted core competitiveness.